Construction Update – Week of June 8
This week has been stressful! We had an electrical inspection on Monday (passed). Building inspection on Tuesday (allowed access to a couple areas). We are still needing a visit from the health department. And, on top of that, staff are showing up. In fact, summer staff orientation starts on Saturday!
In the building lots of progress has happened. Wall finishes are going on. Fire alarm has been completed. The kitchen is almost entirely set up (and is now being clean). Final grading and seeding has happened everywhere. Porch railings are being installed. The boiler is supposed to come on line Friday.
And yet, there is still lots to do. Some lighting fixtures have to be installed and there is plenty of finish carpentry to do. And of course after that, the upstairs has to be finished, chimney installed, big garage doors and wood boiler installed, climbing wall built and some other things. But, we are headed toward completion on phase 1 and that feels good.
Check out the latest photos.
Tags: mission, Mission Possible, Pavi, pavi weekly update, paviprogress
Construction Update – Week of June 8: This week has been stressful! We had an electrical… https://t.co/VKiBapwLyU